Zone du titre et de la mention de responsabilité
Titre propre
Dénomination générale des documents
- Document iconographique
Titre parallèle
Compléments du titre
Mentions de responsabilité du titre
Notes du titre
- Source du titre propre: Title based on contents of the collection
Niveau de description
Institution de conservation
Code de référence
Zone de l'édition
Mention d'édition
Mentions de responsabilité relatives à l'édition
Zone des précisions relatives à la catégorie de documents
Mention d'échelle (cartographique)
Mention de projection (cartographique)
Mention des coordonnées (cartographiques)
Mention d'échelle (architecturale)
Juridiction responsable et dénomination (philatélique)
Zone des dates de production
Date(s)
-
1982-1997, predominant 1994-1997 (Production)
- Producteur
- Northumberland Strait Crossing Project
Zone de description matérielle
Description matérielle
Zone de la collection
Titre propre de la collection
Titres parallèles de la collection
Compléments du titre de la collection
Mention de responsabilité relative à la collection
Numérotation à l'intérieur de la collection
Note sur la collection
Zone de la description archivistique
Nom du producteur
Notice biographique
A " fixed link" between Prince Edward Island and mainland New Brunswick had been the vision of various individuals and groups since PEI joined Confederation in 1873. Various attempts between 1885 and 1970 to persuade the federal government to undertake such a project had failed to come to fruition. Following a provincial plebiscite in January 1988 in which the people of Prince Edward Island voted in favour of a fixed link of undetermined physical form, a bridge design was accepted by the Federal government. In spite of considerable controversy and campaigning by the pro- and anti- link factions, formal bids for bridge construction were received by Ottawa in 1992. The contract was awarded to the lowest bidder, Calgary based Strait Crossing Inc., a consortium of three international firms, Morrison-Knudsen of Boise, Idaho, GTM Entrepose of France, and Ballast Nedam of the Netherlands. The bridge was to be constructed, owned, and operated by a private company for a period of 35 years after which ownership would pass to the federal government. In the meantime the contractor would receive an annual government subsidy of $42 million and all toll booth revenues. Construction was carried out from 1993 to 1997 when the Confederation Bridge was officially opened on June 1.
The overseeing and quality control of the project carried out by Public Works Canada was known as Northumberland Strait Crossing Project.
Historique de la conservation
Présentation du contenu
Zone des notes
Classement
Langue des documents
- anglais
Écriture des documents
Localisation des originaux
Disponibilité d'autres formats
Restrictions d'accès
Délais d'utilisation, de reproduction et de publication
Instruments de recherche
Éléments associés
Éléments reliés
Accroissements
Identifiant(s) alternatif(s)
Zone du numéro normalisé
Numéro normalisé
Points d'accès
Points d'accès sujets
Points d'accès lieux
Points d'accès Noms
- Northumberland Strait Crossing Project (Producteur)
Genre access points
Zone du contrôle
Identifiant de la description du document
Identifiant du service responsable de la description
Niveau de détail
Langue de la description
- anglais